How long does artificial grass take to lay?

Mar 19, 2020 - 2:50 PM

https://megagrass.com/community/question-and-answer/forums/4133/topics/15982 COPY
  • I have a pretty large garden so I wanted to know how much time I am supposed to dedicate for the installation.

    0
  • Typically, a regular installation of artificial turf will take about 3-7 days, some bigger sized installation can take a bit longer. The length of artificial grass installations can largely depend on size and experiences of installation crew, coordinations of materials: it takes good planing and coordinations as the installation process involved with sub base building as well, such sub base requires bulk materials such as drain rock and top soil. Under normal circumstances, the removal of existing grass or preparations for sub base can take one day or two, another day or two for sub base building, then installation of the artificial grass can take another day or two.
    We offer free consultations so please feel free to reach us via this online form for more questions and concerns:
    https://megagrass.com/pages/free-estimates

    0
  • Interesting. I thought it could be done in a day. Thanks for the clarification.

    0